Eaton Terrace

Project Details

Location Eaton Terrace

Nature

Project Size 80 sqm

Sector

Duration 20 Weeks

Value

The basement required temporary works to support the building’s rear elevation. The basement formed below the lower ground floor at the rear of the property.

Challenges

As the basement was formed below the lower ground floor at the rear of the property the materials and muck away had to be carefully co-ordinated to ensure clear access to allow the works to continue.